The method

How every pilot starts.

Every Neuroject pilot begins the same way — we align the WBS and data structure across cost, schedule and the federated model. That shared foundation is what every report, dashboard and decision reads from.

Best practice

The same foundation on every project.

01

Align

We align the Work Breakdown Structure and the project’s data model across cost, schedule and the federated BIM model — one shared language every department works from.

02

Connect

Cost, schedule, quantities and model are tied to that single structure, so budget, progress and scope always read from the same place — not spreadsheets kept in sync by hand.

03

Solve

From there we solve the specific challenge on each project: live progress, cost control, variation and quantity tracking, claim evidence — whatever that team actually needs.

What contractors see

The problem, and how we solved it.

Mixed-use · CityLife

CityWave

The challenge

Cost control and constant design variations had to stay reconciled across two buildings, under one of Europe’s largest urban photovoltaic canopies.

What we did

Imported the full cost dataset and tracked variations and quantities on a single WBS tied to the federated model — budget, variants and progress from one source of truth.

Open the pilot →
Healthcare · Genoa

Gaslini Hospital

The challenge

A modular “hospital-garden” of connected pavilions and courtyards — care, research and teaching delivered under continuous progress pressure.

What we did

One unified WBS and federated model carry cost, schedule and scope; a live Progress Report gives leadership physical and economic progress in a single, always-current view.

Open the pilot →
Infrastructure · Milan

Milan Metro Extension

The challenge

A metro-line extension where progress and schedule had to stay legible across multiple contractors and work lots — underground, phased, on a tight timeline.

What we did

Physical and economic progress reported through Progress Report on a unified WBS linked to the model — one reconciled view of where the line actually stands.

Open the pilot →
Pilots

See it on live projects.

Same method, same foundation — proven on €2.3B+ of construction, from the first WBS code to handover.

Explore all pilots →