Resolve conflicts with the evidence already on record.

When a claim lands, the answer is buried across cost, schedule, scope and correspondence. NeuroBuild keeps the trail intact — so responsibility and impact are traceable across every stakeholder, before a dispute becomes a loss.

Claim resolution

Trace impact across every stakeholder.

The path to a defensible position

From scattered records to a resolution you can defend.

01

Trace

Every change, instruction and delay linked to the work it touched.

02

Attribute

Time, cost and risk impact mapped to the responsible party.

03

Resolve

Walk into any negotiation with the evidence trail already attached.

Every stakeholder, one truth

Owner, contractor, designer, sub — same record.

For the owner

See exactly where time and cost impact originated, without waiting for a claim report.

For the contractor

Defend or raise a claim from a complete, timestamped trail — not reconstructed memory.

For designers

Show what was instructed, when, and what it changed downstream.

For sub-contractors

Your work and its dependencies visible in the same structure everyone else uses.

Before it becomes a dispute

Keep the trail. Settle on facts.

Start with a guided pilot on your own project data.

Talk to us →