Every use case, mapped to the right level of detail.

Design, cost control, planning and reporting each read the Work Breakdown Structure at the level they need — one governed data structure, many use cases.

HQ Acme Company
EN
32 items
Level NameLevel DescriptionLink to Corporate WBSFeaturesActions
WBS CodesWork Breakdown Structure
TypologyType of Code
LocationAddressing Codes
WBS0ID Commessa
WBS6 WBS7 WBS9
WBS1Project WBS1Tag
WBS2Contract
WBS3Building
WBS4Level
WBS5Functional Area Corporate
SpecificationTechnical Specifications
WBS5Project CategoryTag
WBS6Zone
WBS7Category of Work WBS5Attachment
Filter by 1 or more WBSs
WBS LevelItem codeItem descriptionLink to Corporate WBSLast modifiedStateActions
WBS1OUHOUH08/10/2025, 22:13:56
WBS1DP100DP10027/04/2025, 11:05:08
WBS1V01Variant 127/04/2025, 11:05:08
WBS1V02Variant 227/04/2025, 11:05:08
WBS1V03Variant 327/04/2025, 11:05:08
WBS1V04Variant 427/04/2025, 11:05:08
WBS1V05Variant 527/04/2025, 11:05:08
WBS1V08Variant 827/04/2025, 11:05:08
WBS1V10Variant 1027/04/2025, 11:05:08
WBS1V11Variant 1127/04/2025, 11:05:08
WBS1V14Variant 1427/04/2025, 11:05:08
WBS1V17Variant 1727/04/2025, 11:05:08
WBS7ST03Foundation Slab28/04/2025, 01:11:25
WBS8 – Work Categories
PRESite Preparation & Remediation
DEMDemolition & Removal
ERTEarthworks (excavation, transport, disposal)
GRSGround Support
SFNSpecial Foundations
RCFDirect RC Foundations
UPGStructural Upgrades
CIPCast-in-place Load-bearing Structure
PCCPrecast RC Load-bearing Structure
STLSteel Load-bearing Structure
TMBTimber Load-bearing Structure
JNTSeismic / Fire Joints, Bearings
WBS9 – Work Subcategory
PRE-01Environmental Remediation
PRE-02War Remnant Clearance (UXO)
PRE-03Surveys, Investigations
PRE-04Topographic Surveys
PRE-05Archaeological Surveys & Excavations
PRE-06Wellpoint / Wells / Water Table Lowering
DEM-01Building Demolition
DEM-02Selective Structural Demolition
DEM-03Removals / Strip-out (civil & MEP)
DEM-04Protections
DEM-05Explosive Demolition
DEM-06Hydrodemolition
WBS7 – Structure Categories
DEMDemolition, remediation, excavation & landfills
WBS8 – Work Categories
PRESite Preparation & Remediation
WBS9 – Work Subcategory
PRE-01Environmental Remediation
PRE-02War Remnant Clearance (UXO)
PRE-03Surveys, Investigations
PRE-04Topographic Surveys
PRE-05Archaeological Surveys & Excavations
PRE-06Wellpoint / Wells / Water Table Lowering
Use case
Level
Actions
Design
WBS0WBS1WBS2WBS3WBS4WBS5WBS6WBS7
Cost Control
WBS0WBS1WBS2WBS3WBS4WBS5WBS6WBS7
Planning
WBS0WBS1WBS2WBS3WBS4WBS5WBS6WBS7
Progress Report
WBS0WBS1WBS2WBS3WBS4WBS5WBS6WBS7
View WBS (Project)
Detailed view of WBS item code
WBS Level
WBS7 – Category of Work
WBS Code
ST03
Short description
Foundation Slab
Description
Enter WBS long description
Link to parent
Choose one or more…
WBS5 – ST
WBS5Project Category
ST
Structure
WBS7Category of Work
ST03
Foundation Slab
Right detail, right level

Every use case, at the right depth.

Map each use case to the level of the Work Breakdown Structure where it actually lives — so design, cost, planning and progress each read the data at the detail they need.

Mapped to WBS levels

Each use case is tied to the WBS level it belongs to — no more one-size-fits-all data.

One shared structure

Design, cost, planning and progress all draw from the same governed data structure.

No detail lost

Zoom from portfolio down to a single work item without ever breaking the chain of traceability.

No more surprises

See Data Structure on your projects

Start with a guided pilot on your own data.

Book a Demo →